Projects
Ysbyty
Ystrad Fawr Hospital
Client: BAM
Construction Ltd
Project:   Ysbyty
Ystrad Fawr     Hospital
Completion Date: Autumn
2011
Location: Ystrad
Mynach, South     Wales
Statistics: Tonnage:
475 tons
Project Overview:
Ysbyty Ystrad Fawr is the largest
new hospital to be built in Wales for over 30 years at a projected
cost of £171m. It will have 255 beds, all with private rooms
and en suite bathrooms..
Hayes have;
- Manufactured all the structural steelwork.
- Fabricated all of the steelwork for the roof and outer buildings.
- Installed all of the cold rolled purlins and side rails in
readiness for cladding.
- Manufactured all the secondary steelwork inc handrails, balustrades
and staircases.
Click the images below for a larger view
|